In our research, we have conducted further studies of parametric facades developing diferent prototypes of patterns that can be applied in projects. Following various parameters, the implementation of these models are subject to the program and use of the building and the location where they can play not only the role of the skin, but extend the design to new lines of innovation where there (...)
With the start of the construction of the El Rengle Residential project last January, the first phase of foundations is now complete. With the collaboration of Stupendastic Films, we present the first video with the evolution of this residential project built and promoted by Sorigué.
Watch it on Vimeo here
Within the research and application of new tools and technologies, ON-A has established the BREEAM certification platform. This method of assessing and certifying the sustainability of buildings is classified as the most technically advanced and has maintained its leadership worldwide with extensive experience, consolidating its presence in Spain. In this way, the latest tools and criteria (...)
On the 19th of April at the Hotel Catalonia Barcelona Plaza, Grupo Vía organised the conference “Agora: New residential architecture projects” in which the current activity in the housing sector was debated. The event was attended by Jordi Fernández, who presented as an example the new housing, retail and office complex “El Rengle Residencial” next to Passeig de la Marina in Mataró, a (...)
The result of the new pavilion “St John’s Park Pavilion” located in the district of Manhattan, responds to the exploration of parametric design to create a structure encoded in a three-dimensional mesh. With this technology we obtain schemes of controlled parameters that allow us to dominate the geometry we want to transmit with maximum precision.
Watch it on Vimeo here
The El Rengle Tower residential building in Mataró, designed by ON-A, is currently in the construction phase. The project management and planning will be developed through the BIM methodology with the participation of the technicians involved in the construction phase. This is a big step in the sector with a new perspective where the collaborators and the ON-A team work together with this (...)
On the Atresmedia news programme “Hazte Eco”, Jose Antonio González, manager of Arquima Barcelona, explains the assembly process of the Pre-Fab House by ON-A and the virtues of wood construction.
Related link: www.arquima.net
The construction process of the single-family home Pre-Fab House designed by ON-A continues. During the months of September to January, the assembly of the wooden structure and the facade enclosures were completed.
Watch it on vimeo here
At the beginning of 2016, construction will begin on the El Rengle residential development in Mataró. A unique building next to the beach with almost 14,000 m² that will have 3,000 m² of office space, 60 flats and two floors of underground parking with capacity for more than 120 cars and 60 storage rooms. A building that aspires to be a benchmark project designed and managed entirely with (...)
The acquisition of our 3D printer has allowed us to develop during these months many prototypes and models of recent projects as well as improved models of old ON-A projects. We invite you to discover our showroom in Barcelona (C/ Doctor Rizal, 8). A place always open to clients, collaborators and anyone interested in design and architecture.
The new official verdtical catalogue is now available, which focuses on the use of green facade applied to architectural and engineering projects. Among its pages, you will find three ON-A projects that bet on these green, sustainable, and efficient systems as a new facade solution.
Related link: www.verdtical.com
VERDTICAL, a company specialising in vertical ecosystems and bioclimatic architecture, has installed a vertical garden in our Barcelona headquarters.
This piece, located in the central courtyard of our office and visible from all work areas, becomes the new green heart of the office.
A place to relax, be inspired, and enjoy.
ARQUIMA, a company specializing in modular construction with wooden structures, carries out the on-site assembly of the modules of the Pre-Fab House. Modular construction allows the execution of large pieces in the workshop, which are then installed very quickly and efficiently on site. In this case, despite the geometric complexity of the project, it took only 5 working days to complete (...)